Minimum Order Quantity | 1piece |
Packaging Details | Export standards |
Payment Terms | L/C, T/T |
Place of Origin | Changsha, Hunan, China |
Model Number | Connection between transfer case housing |
Price | 80$ |
Delivery Time | 5 work days |
Supply Ability | 20 pcs/month |
Brand Name | OEM |
Detail Information | |||
Adapted Models: | Pump Truck | Factory Code: | A820405000086 |
---|---|---|---|
Weight: | 2kg | ||
High Light: | Concrete Pump 3Axis End Cover, Pump Transfer Case 3Axis End Cover |
Product Description
Sany And Zoomlion Concrete PumpTransfer Case Three-Axis End Cover Connection Between Transfer Case Housing And 055 Arm P
The installation of the PTO (Power Take-Off) split gearbox oil pump flange in a concrete pump truck involves the following steps:
It is important to note that the specific installation process may vary depending on the concrete pump truck model and manufacturer’s instructions. It is recommended to consult the equipment’s manual or seek professional guidance during the installation procedure to ensure proper installation and operation of the PTO split gearbox oil pump flange.
Copyright © 2024.Company name All rights reserved.技术支持:禾格科技(www.hegekeji.com)