Our Office
Building 105-G0001, Building 3#, Gaofeng Intelligent Manufacturing Industrial Park, No. 256, Block Lixin Street, Changsha Economic Development Zone, Changsha Area, China (Hunan) Pilot Free Trade Zone
Call Us
+8618975137227

Steel Zoomlion Concrete Pump Parts Hydrocylinder S Tube Swing Valve

Minimum Order Quantity1
Packaging DetailsExport standard packing 510*190*141
Payment TermsD/P, T/T
Place of OriginChangsha, Hunan, China
Model NumberF6000/F9000
Price$200-220
Delivery Time7 work days
Supply Ability300 pcs/month
Brand NameChangsha Tongchuang Mechanical
Detail Information
Name:S-tube Hydrocylinder / Swing Valve HydrocylinderApplicable Model:Applicable To All Models Of Sany Concrete Pump/pump Truck /truck-mounted Pump
Specifications And Models:F6000/F9000Specification Size:510*190*141mm
Weight:36KGChromium Coating:≥0.2
Quality Assurance:12 MonthsMaterial:Steel
High Light:Zoomlion Concrete Pump Parts Hydrocylinder, S Tube Zoomlion Concrete Pump Parts, Swing Valve Concrete Pump Hydrocylinder

Product Description

Zoomlion Concrete Pump Parts S-tube hydrocylinder / swing valve hydrocylinder

Zoomlion Concrete Pump Parts S-tube hydrocylinder / swing valve hydrocylinder
NameS-tube hydrocylinder / swing valve hydrocylinder
Place of originChangsha, Hunan, China
Brand nameChangsha Tongchuang Mechanical
Applicable modelApplicable to all models of Sany concrete pump/pump truck /truck-mounted pump
Specifications and modelsF6000/F9000
Specification size510*190*141mm
Weight36KG
chromium coating≥0.2
Quality assurance12 months
MaterialSteel
Supply capacity300 Pieces/month
PackingExport standard packing 510*190*141mm
Minimum order1
Price$200-220

Product features and advantages:

1, Compact structure, high hardness of chromium plating layer on piston rod.
2, Good wear resistance
3, Adopt imported SKF seal, with better sealing performance and long service life.

Maintenance method:

1, Regularly check whether the piston rod leaks hydraulic oil.
2, Make sure that the surface of the piston rod is clean and free of foreign matters during each concrete pumping process, so as to prevent the piston rod from being pulled.
3, When oil leaks, it is necessary to replace the seal package of the swing cylinder in time; when the piston rod is pulled, it is necessary to replace the swing cylinder assembly.

Leave a comment

Contact Form Demo

Contact Us

Our Office
Building 105-G0001, Building 3#, Gaofeng Intelligent Manufacturing Industrial Park, No. 256, Block Lixin Street, Changsha Economic Development Zone, Changsha Area, China (Hunan) Pilot Free Trade Zone
Call Us
+8618975137227
Contact Us

Copyright © 2024.Company name All rights reserved.技术支持:禾格科技(www.hegekeji.com)