Our Office
Building 105-G0001, Building 3#, Gaofeng Intelligent Manufacturing Industrial Park, No. 256, Block Lixin Street, Changsha Economic Development Zone, Changsha Area, China (Hunan) Pilot Free Trade Zone
Call Us
+8618975137227

Zoomlion Concrete Pump Parts Concrete Pump Delivery Cylinder ¢200/230/260

Minimum Order Quantity1
Packaging DetailsExport standard packing 2200*280*280mm
Payment TermsD/P, T/T
Place of OriginChangsha, Hunan, China
Model Number260*2250/230*2250/230*1800/200*1800
Price$780-1100
Delivery Time7 work days
Supply Ability100pcs/month
Brand NameChangsha Tongchuang Mechanical
Detail Information
Name:Concrete Conveying CylinderProduct Name:Concrete Cylinder
Applicable Model:Suitable For Pump Trucks, Truck-mounted Pumps And Trailer PumpsSpecifications And Models:260*2250/230*2250/230*1800/200*1800
Specification Size:2200*280*280mmChromium Coating:≥0.25mm
Useful Life(m³):100000Material:Super Wear-resistant Material+Chrome Plating On Inner Wall
High Light:Zoomlion Concrete Pump Parts Delivery Cylinder, Zoomlion Concrete Pump Parts Cylinder, Zoomlion Concrete Pump Delivery Cylinder

Product Description

Zoomlion Concrete Pump Parts Concrete conveying cylinder ¢200/230/260

Zoomlion Concrete Pump Parts Concrete conveying cylinder ¢200/230/260
NameConcrete conveying cylinder
Product nameConcrete cylinder
Place of originChangsha, Hunan, China
Brand nameChangsha Tongchuang Mechanical
Applicable modelSuitable for pump trucks, truck-mounted pumps and trailer pumps
Specifications and models260*2250/230*2250/230*1800/200*1800
Specification size2200*280*280mm
Weight165KG
chromium coating≥0.25mm
Useful life(m³)100000
MaterialSuper wear-resistant material+Chrome plating on inner wall
Supply capacity100 Pieces/month
PackingExport standard packing 2200*280*280mm
Minimum order1
Price$780-1100

Product features and advantages:

Using a new process of plasma quenching and chrome plating, the thickness of the chrome layer is greater than 0.25mm, which can effectively improve the service life and reduce costs

Maintenance method:

1, The sealing body of the concrete piston needs to be fully lubricated, and the water in the washing room is turbid, and the concrete piston should be replaced immediately to avoid strain on the conveying cylinder.
2, The glasses plate, cutting ring and transition sleeve also need to be replaced in time, otherwise the service life of the concrete conveying cylinder will be reduced.

Leave a comment

Contact Form Demo

Contact Us

Our Office
Building 105-G0001, Building 3#, Gaofeng Intelligent Manufacturing Industrial Park, No. 256, Block Lixin Street, Changsha Economic Development Zone, Changsha Area, China (Hunan) Pilot Free Trade Zone
Call Us
+8618975137227
Contact Us

Copyright © 2024.Company name All rights reserved.技术支持:禾格科技(www.hegekeji.com)