Our Office
Building 105-G0001, Building 3#, Gaofeng Intelligent Manufacturing Industrial Park, No. 256, Block Lixin Street, Changsha Economic Development Zone, Changsha Area, China (Hunan) Pilot Free Trade Zone
Call Us
+8618975137227

Air Control Box Assembly Of The Concrete Mixing Truck

Minimum Order Quantity1
Packaging DetailsExport standard packing
Payment TermsD/P, T/T
Place of OriginChangsha, Hunan, China
Model Number0.35~0.4MPa
Price$35-$45
Delivery Time1 work days
Supply Ability150 pcs/month
Brand NameChangsha Tongchuang Mechanical
Detail Information
Name:Air Control Box Assembly Of The Mixing TruckProduct Name:Cooler
Applicable Model:Mixer TruckSpecifications And Models:0.35~0.4MPa
Specification Size:100*80*20mmWeight:1KG
Parameters:For 10-22 Square Mixer TruckUse:Air Supercharger
High Light:Mixer Air Control Box Assembly, Concrete Truck Air Control Box, Mixer Truck Air Control Box

Product Description

Note when using the air control box assembly of the concrete mixing truck:

1:Factory default of pressure relcase valve is 0.35-0.4MPa. Adjustment at will is not allowed

2:After washing,open the discharge valve to drain the remaining gas

3:When the temperature is below 0’C ,and the car is not in use.you must exhaust the redualwater of the jacket water tank.pipeline,valve and so on.ln order to avoid cracking.

Maintenance method:                             

1, the product is a vulnerable part, when the factory pressure has been adjusted to the specified pressure, it is strictly prohibited to adjust the pressure again. In long-term use, if the leakage occurs in the reversing valve, only need to remove the M8 on the reversing handle, adjust the bolt on the reversing valve stem and tighten it 1 / 4-1 / 2 circle (if the gas control box is replaced, it will not be approved);

2. When the water tank adds water, first open the exhaust valve to completely discharge the water tank pressure and then open the water valve to start the water;

3. When the water tank level gauge is full, close the water valve and exhaust valve:

4. Open the water inlet valve when the idle engine and the chassis pressure reaches 0.5MPa; use the flushing system when the pressure displayed by the water pressure gauge is 02-03MPa;

5, when the continuous use of the flushing system, each time should be carried out according to the above requirements

Leave a comment

Contact Form Demo

Contact Us

Our Office
Building 105-G0001, Building 3#, Gaofeng Intelligent Manufacturing Industrial Park, No. 256, Block Lixin Street, Changsha Economic Development Zone, Changsha Area, China (Hunan) Pilot Free Trade Zone
Call Us
+8618975137227
Contact Us

Copyright © 2024.Company name All rights reserved.技术支持:禾格科技(www.hegekeji.com)